14 Sep 2014
86° Clear
Patch Instagram photo by cstraface
Patch Instagram photo by lpfirefighters
Patch Instagram photo by lpfirefighters
Patch Instagram photo by terbear_13
Patch Instagram photo by rachiegirl
Patch Instagram photo by avhs_decacustom
Patch Instagram photo by rachiegirl

Asphalt Pavement Repair, Resurfacing Along Foothill Road at I-580 Interchange Starts Soon

Officials warn of possible traffic delays during the construction.

Asphalt Pavement Repair, Resurfacing Along Foothill Road at I-580 Interchange Starts Soon

The City of Pleasanton’s traffic engineering division reports that asphalt pavement repair and resurfacing will occur along Foothill Road at I-580 Interchange at night on July 14th thru July 25th between 9:00 PM and 5:30 AM. 

One travel lane in each direction along Foothill Road will remain open during construction. Traffic delays are expected due to the lane closures. 

Pedestrian access will be maintained at all times.

The on-ramp to eastbound I-580 from southbound San Ramon Road will be closed on July 16th between 8 PM and 5 AM for asphalt pavement repair and resurfacing. Detour signs will be in place to direct traffic to an alternate route.

—Information submitted by City of Pleasanton

 

Share This Article