20 Aug 2014
61° Clear
Patch Instagram photo by legallyblonde27
Patch Instagram photo by legallyblonde27
Patch Instagram photo by ermyceap
Patch Instagram photo by taratesimu
Patch Instagram photo by taratesimu
Patch Instagram photo by lilyava299
Patch Instagram photo by _mollfairhurst
Patch Instagram photo by thecontemporaryhannah
Patch Instagram photo by lucyketch

Casey Overpass To Be Shut Down for Repaving

The remaining work is scheduled for Sunday night, 9 p.m. to 5 a.m.

Casey Overpass To Be Shut Down for Repaving

The Casey Overpass, despite the fact it is scheduled to be torn down, is getting repaved.

Work began Wednesday and Thursday on the project, causing closure of the bridge to traffic. Work is scheduled to begin Sunday night at 9 p.m. and finish Monday morning at 5 a.m.

The future of the bridge is a hot topic in JP. After it is torn down, the state will either rebuild a new, lower bridge or put all the traffic at ground level.

For all JP Patch coverage of this important issue, please visit our Casey Overpass topic page.

Share This Article