20 Aug 2014
74° Clear
Patch Instagram photo by ermyceap
Patch Instagram photo by taratesimu
Patch Instagram photo by taratesimu
Patch Instagram photo by lilyava299
Patch Instagram photo by _mollfairhurst
Patch Instagram photo by thecontemporaryhannah
Patch Instagram photo by lucyketch
Patch Instagram photo by laurabarreto87
Patch Instagram photo by lghtwght

Brown Street/Whipple Road Bridge Ribbon Cutting on Friday

State and local officials will gather for the official re-opening of bridge that has been closed for two-and-a-half years.

Brown Street/Whipple Road Bridge Ribbon Cutting on Friday

State and local officials from Tewksbury, Billerica and Wilmington will gather in South Tewksbury on Friday at 11 a.m. for the official ribbon-cuting ceremony, marking the re-opening of the Brown Street/Whipple Road Bridge.

The event will be hosted by Massachusetts Department of Transportation Highway Administrator Frank DePaola.

The bridge has been closed since being heavily damaged by flood waters in the Spring of 2010. Work began on the project in April and was s, route: {:controller=>"articles", :action=>"show", :id=>"what-is-the-status-of-the-brown-street-whipple-road-bridge-project-ede486fc"} -->

Share This Article