21 Aug 2014
70° Heavy Rain
Patch Instagram photo by legallyblonde27
Patch Instagram photo by legallyblonde27
Patch Instagram photo by ermyceap
Patch Instagram photo by taratesimu
Patch Instagram photo by taratesimu
Patch Instagram photo by lilyava299
Patch Instagram photo by _mollfairhurst
Patch Instagram photo by thecontemporaryhannah
Patch Instagram photo by lucyketch

Storm Debris Collection Continues on 7 Streets Today

The following streets will have storm debris picked up starting Friday, Dec. 14.

Storm Debris Collection Continues on 7 Streets Today

Manalapan Township Department of Public Works is working with hired contractors to clean up the storm debris that Hurricane Sandy left behind.

The streets that are scheduled for branch, brush, and debris collection starting on Friday, Dec. 14 are:

    • Appomatox Road
    • Holiday Park Development
    • Ivanhoe Drive
    • Kinney Road
    • Precedent Way
    • Saupe Drive/Bonnie Drive
    • Turtle Hollow Development

      Please place all tree limbs, branches, brush, and damaged trees at the curb for collection and be sure that it is not in the street or juts out into the street as this can be hazardous to drivers.

      The Public Works and contractor trucks may be coming around the neighborhood to collect debris in the early morning hours in order to accomplish as much as possible.

      Share This Article