Community Corner
Road Repair Work From May Through June
Motorists can expect lane restrictions and reduced speed. Please approach the area with caution and obey all traffic control devices.
Press release from Pima County:
May 17, 2021
Pima County, Ariz. (May 13) – Beginning Monday, May 17, between 2 a.m. to 2 p.m., Pima County Department of Transportation and contractor, KE&G Construction, Inc., will be performing road repair work at the following locations:
Find out what's happening in Tucsonfor free with the latest updates from Patch.
- Romero Road: Ruthrauff Road to Roger Road: May 17 through May 25: Monday through Friday from 2 a.m. to 2 p.m.
- Wetmore Road: La Cholla Boulevard to Romero Road: May 17 through May 25: Monday through Friday from 2 a.m. to 2 p.m.
- Palo Verde Road: Benson Highway to Drexel Road: June 1 through June 4: Monday through Friday from 2 a.m. to 2 p.m.
The work will consist of setting traffic control, lowering utilities, milling and repaving and temporary striping. Final striping will take place the week of June 7.
Motorists can expect lane restrictions and reduced speed. Please approach the area with caution and obey all traffic control devices. Minor delays will occur during this work.
Find out what's happening in Tucsonfor free with the latest updates from Patch.
In the event of mechanical failure or inclement weather, the construction schedule is subject to change.
In Fiscal Year 2020/2021, the Pima County Board of Supervisors and Transportation Department allocated $56 million in road repair and preservation funding for the Road Repair and Preservation Program. To learn about the Department of Transportation’s Pavement Preservation Program and the projects that are currently scheduled, please visit www.pima.gov/RoadRepairMap.
This press release was produced by Pima County. The views expressed here are the author’s own.