Lamorinda
News Feed
Events
Local Businesses
Classifieds
Community Corner

Lafayette Reservoir Walkers Get Smoother Path: Report

A heavily used reservoir path is getting rebuilt alongside the more dramatic tower seismic project.

| Updated
A Lafayette Reservoir path will be rebuilt, creating a more user-friendly space. (Renee Schiavone/Patch)

LAFAYETTE, CA — Walkers tackling one of Lafayette Reservoir's roughest stretches will soon get a smoother route as crews rebuild the steep path between the dam, visitor center, and main parking area, the Bay Area Telegraph reported.

The short, heavily used section had deteriorating pavement and felt cramped in places, contrasting with the smoother Lakeside Nature Trail around the reservoir.

Subscribe

The East Bay Municipal Utility District is rebuilding the path as part of its larger Lafayette Reservoir Tower Seismic Upgrade project, according to the Bay Area Telegraph.

EBMUD said the tower project required localized widening of the access road for heavy equipment. Work that began in May also included a temporary boat ramp, barge placement, and scaffolding around the tower.

The road work created an opportunity to rebuild the adjacent pedestrian route, according to reports.

The project covers the shorter connector descending from the dam toward the visitor center and parking area.

More from Lamorinda
News | 23h
News | 1d
News | 5d
See more on Patch >

Sign up for free local newsletters and alerts for the
Lamorinda Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information