PALM SPRINGS, CA — The City of Palm Springs has completed its Racquet Club Road reconfiguration project, which included roadway resurfacing, new bicycle lanes, sidewalk improvements and updated traffic striping, the city said.
The city announced the completion Tuesday, thanking residents for their cooperation and patience throughout construction.
The project converted the existing four-lane roadway into one travel lane in each direction, with designated bicycle lanes and a continuous two-way left-turn lane. The changes are intended to improve roadway safety for motorists, bicyclists and pedestrians, the city said.
Additional improvements included the installation of Class II bicycle lanes, pavement resurfacing, new signage and roadway striping.
The project also added sidewalk segments at key locations to improve pedestrian access and installed Americans with Disabilities Act-compliant curb ramps to enhance accessibility and pedestrian connectivity.
Residents seeking additional information about the project can contact the city at 442-221-0015 or email SPCreconfiguration@palmspringsca.gov.
Sign up for free local newsletters and alerts for the
Palm Springs Patch
Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.