Santa Cruz drivers face lane reductions in both directions on Highway 1 between Mission Street and Laurent Street for a sewage replacement project, Cruz511 announced. Travelers should plan for possible delays of 15 to 30 minutes.
Work was scheduled to begin Monday, Nov. 16, with completion expected by Monday, Nov. 23. Construction hours are Monday through Friday from 9 a.m. to 2 p.m.
Message and directional signs will alert drivers ahead of lane closures. Drivers are advised to slow down and travel carefully through work zones.
Road updates are available through Caltrans District 5 on Twitter at @CaltransD5 and Facebook at Caltrans Central Coast (District 5). Updates are also available on Instagram and Threads at @Caltrans_D5.
Source: "Highway 1 Sewage Repair Project Starts 11/16" (cruz511.org)
Sign up for free local newsletters and alerts for the
Santa Cruz Patch
Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.