Greater Hartford
News Feed
Events
Local Businesses
Classifieds
Community Corner

Pump Station Completed For Massive Hartford Sewer Tunnel Project

The MDC has completed a $138 million pump station for a four-mile tunnel designed to reduce sewage overflows in Greater Hartford.

HARTFORD, CT — A $138 million pump station that will serve a massive underground tunnel designed to reduce sewage overflows into Greater Hartford waterways has been completed, marking another major milestone in the Metropolitan District's largest infrastructure project.

The MDC held a ribbon-cutting Thursday, Oct. 1, for the South Hartford Tunnel Pump Station at 255 Brainard Road in Hartford.

Subscribe

The MDC provides water, water pollution control, mapping, and household hazardous waste collection to eight member municipalities: Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield and Windsor.

Additionally, the MDC provides drinking water to portions of Farmington, Glastonbury, East Granby and South Windsor, known as the MDC's non-member towns.

The pump station is a critical component of the South Hartford Conveyance and Storage Tunnel, a 4-mile-long tunnel designed to capture and temporarily store combined wastewater and stormwater during heavy rain before sending it to the Hartford Water Pollution Control Facility for treatment.

The project includes several notable figures:

The tunnel is part of the MDC's Integrated Plan/Clean Water Project, a multibillion-dollar wastewater infrastructure program intended to reduce combined sewer overflows and improve regional water quality.

"The completion of the South Hartford Tunnel Pump Station marks another transformative achievement for the MDC," MDC Chief Executive Officer Scott Jellison said. "This facility is a vital piece of infrastructure that will help maximize the effectiveness of the tunnel system, reduce CSOs, improve water quality in our communities, and protect the Connecticut River watershed for generations to come."

The completed pump station represents another step toward putting the tunnel system into full operation, according to the MDC.

Connecticut Department of Energy and Environmental Protection Acting Commissioner Emma Cimino said the project is intended to reduce wastewater entering local waterways, the Connecticut River and Long Island Sound, while improving public safety for Hartford residents and downstream communities.

U.S. Rep. Joe Courtney, whose 2nd Congressional District includes communities downstream along the Connecticut River, joined MDC and state officials for Thursday's ribbon-cutting.

Federal funding for the broader project has included support through the Clean Water State Revolving Fund and the 2021 Infrastructure Investment and Jobs Act, according to Courtney's office.

For more information, click on this link.

More from Greater Hartford
News | 6h
News | 1d
News | 1d
See more on Patch >

Sign up for free local newsletters and alerts for the
Greater Hartford Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information