Newtown
News Feed
Events
Local Businesses
Classifieds
Traffic & Transit

Lane Closures Coming To Route 34 In Newtown For Months-Long Project

Slope stabilization work is expected to begin next month, according to CTDOT.

NEWTOWN, CT — Motorists who travel Route 34 in Newtown should prepare for delays as a months-long construction project is set to begin next week.

The Connecticut Department of Transportation announced slope repair and stabilization work will begin Monday, Aug. 3 and is expected to continue through Saturday, Oct. 31.

Subscribe

During construction, a lane closure will be in effect on Route 34 between Jordan Hill Road and Great Quarter Road. A temporary traffic signal will direct alternating one-way traffic through the work zone.

According to CTDOT, the project includes installation of temporary precast concrete barriers, steel sheet piles, stone riprap and pavement line striping.

Motorists are advised to slow down and use caution while traveling through the area.

CTDOT noted the project schedule could change because of weather or other unforeseen conditions.

More from Newtown
News | 4h
News | 1d
News | 2d
See more on Patch >

Sign up for free local newsletters and alerts for the
Newtown Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information