This post was contributed by a community member. The views expressed here are the author's own.

Health & Fitness

Renovation and Expansion of the Ambulance Service of Manchester: Volume 6

MANCHESTER — The renovation of space once occupied by Marcus Communications continues.

  • Basic framing was completed and most of the dry wall is in place and has been joined with compound and sanded within the new space.
  • The fire sprinkler system has been extended to pass the level of the drop ceiling.
  • HAVC systems have been upgraded and re-routed.
  • The basic shape of the rooms is evident.
  • Doorways have been framed in the main hallway.
The next steps are to complete the drywalling process and begin installing the drop ceiling. Visible in the pictures is the shape of the new office space, hallways, training rooms, billing office area, restrooms and medical staging areas.

When completed, the renovated space will include additional training and simulation areas, a relocated locker area, new offices, a medical supply staging area, and two new restrooms although the plans remain fluid.

Learn more about us at www.asm-aetna.com/blog

Find out what's happening in South Windsorfor free with the latest updates from Patch.


The views expressed in this post are the author's own. Want to post on Patch?