Stonington
News Feed
Events
Local Businesses
Classifieds
Traffic & Transit

Mystic Bridge Undergoes Repairs After Getting Stuck Open

A temporary schedule is in effect for marine traffic after the drawbridge was stuck in the open position last week.

A new schedule is in effect for marine traffic after the drawbridge was stuck in the open position last week. (Ellyn Santiago/Patch)

MYSTIC, CT — After the Mystic drawbridge was stuck open, the bridge now has a new schedule for openings.

The Town of Stonington wrote last week that "due to ongoing mechanical issues" with the bridge, there will be a temporary change to openings.

Subscribe

The schedule change is to allow for electrical repairs to be done on the bridge.

The bridge will only be open for marine traffic daily at 7:40 a.m., 11:40 a.m., 2:40 p.m. and 6:40 p.m.

The town said the change will remain in place until Sept. 4.

On Wednesday, Aug. 21, Main Street was closed in both directions across the Mystic River due to the bridge being stuck in the upright position, according to WTNH News-8.

More from Stonington
News | 1d
News | 4d
News | 6d
See more on Patch >

Sign up for free local newsletters and alerts for the
Stonington Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information