Politics & Government
Input Sought On Trumbull's Separate Storm Sewer Systems Report
The General Permit requires a 45 day public comment period on the draft plan before it is filed with CTDEEP.
TRUMBULL, CT — Please be advised that The Town of Trumbull, as being registered under the Connecticut Department of Energy and Environmental Protection’s (CTDEEP) General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems MS4 (latest five year permit issued in 2017), is required by provisions of the Clean Water Act and registration under the General Permit, to file an annual report of activities undertaken to meet the Minimum Control Measures specified in the Permit and in the Town’s Stormwater Management Plan.
The General Permit requires a 45 day public comment period on the draft plan before it is filed with CTDEEP.
Find out what's happening in Trumbullfor free with the latest updates from Patch.
Accordingly, the report can be viewed in the Engineering Department at the DPW Admin Building, 366 Church Hill Rd, Trumbull, and/or it can be viewed on the Town of Trumbull website: https://www.trumbull-ct.gov/DocumentCenter/View/5801/2021-MS4-Annual-Report-Draft-PDF
Comments relative to the Annual Report may be directed in writing to:
Find out what's happening in Trumbullfor free with the latest updates from Patch.
William C. Maurer, PE, LS, CFMTown Engineer366 Church Hill Rd Trumbull, CT 06611
This press release was produced by the Town of Trumbull. The views expressed here are the author’s own.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.