Windsor Locks
News Feed
Events
Local Businesses
Classifieds
Schools

Why East Windsor Wants Residents Inside Its High School

Residents can tour the high school Tuesday as officials explore a new middle/high school campus and a possible 2027 referendum.

EAST WINDSOR, CT — Residents can walk through East Windsor High School on Tuesday to see the aging facilities behind a proposal to build a new middle and high school campus, as district officials explore a possible 2027 referendum.

The guided tour begins at 6:30 p.m. Nov. 17, followed by a 7:30 p.m. question-and-answer session in the auxiliary gymnasium. The district asks residents to register in advance if possible.

Subscribe

The visit will offer a chance to see "the aging facilities, outdated spaces, and infrastructure needs shaping conversations about the future of our schools," East Windsor Public Schools said in its announcement.

According to draft minutes of the Nov. 11 school board meeting, Superintendent Patrick Tudryn said the Donovan Group recommended moving the community forum to the high school so more residents could tour it. Board members supported the change.

Vice Chair Noreen Farmer reported that many people, including state Sen. Saud Anwar, attended an earlier Nov. 4 tour. Officials also discussed additional outreach through the Senior Center and PTO meetings.

As Patch previously reported, the district's statement of building needs identifies a need to replace the high school's roof and windows, along with mechanical, electrical and plumbing systems that have reached or passed their expected useful lives. The assessment also identifies accessibility problems and security concerns involving doors and hardware.

The middle school has similar roof, window and building-system needs, plus entrances and bathrooms that do not meet accessibility requirements, according to the assessment.

READ MORE:

The broader planning effort grew from an attempt to obtain state heating, ventilation and air-conditioning grants following heat-related school closures. According to the town and district's project website, consultants found extensive building deficiencies that prevented that effort from proceeding and recommended addressing the buildings more comprehensively.

The broader proposal includes a new campus for grades 5–12 at the existing high school site and a major renovation of Broad Brook Elementary School. The Board of Education considers the middle/high school project the higher priority.

The project FAQ describes separate middle and high school wings, cafeterias and gymnasiums, with shared facilities including an auditorium, media center and kitchen. The district says the arrangement would not produce transportation savings.

A September 2025 consultant report estimated new middle/high school construction at $98.59 million, compared with $103.06 million to renovate and expand the existing high school for both schools. It recommended new construction because of the lower estimated cost, improved layout and separation between age groups.

The same report estimated the elementary renovation at $46.86 million, bringing the two projects to about $145.45 million before state reimbursement. Those figures were based on preliminary conceptual designs, rather than a final referendum budget.

The Nov. 4 planning committee agenda called for updated construction estimates, operating savings, a town financial update and discussion of a referendum timeline.

The district's latest announcement describes a 2027 vote as a possibility under exploration. It does not announce a referendum date or final borrowing amount.

For more Northern Connecticut news, follow Patch editor Jay Kenney.

More from Windsor Locks
News | 11h
News | 2d
News | 2d
See more on Patch >

Sign up for free local newsletters and alerts for the
Windsor Locks Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information