Windsor Locks
News Feed
Events
Local Businesses
Classifieds
Traffic & Transit

What’s Changing Along The Windsor Locks Canal Trail

Work is expected to start in 2027 after the state required asphalt in place of stone dust.

WINDSOR LOCKS, CT — The canal trail that links downtown Windsor Locks with Suffield is slated for a full repaving after Connecticut committed more than $2.5 million for the work, state Rep. Tami Zawistowski said Thursday. Construction is expected to begin in 2027.

The trail follows the historic towpath between the canal and the Connecticut River. In downtown Windsor Locks, a path connects the canal trail to the new train station via Bridge Street, according to the transportation department. The station opened Oct. 18 for CTrail and Amtrak service.

Subscribe

"The new pavement will also be safer for all, including families, seniors and those with mobility challenges," Zawistowski wrote on Facebook.

READ MORE:

Zawistowski said the Connecticut Department of Transportation accepted Suffield's application for funding through the state's Local Transportation Capital Improvement Program. Suffield is leading the project, which she said will cover the entire 4.5-mile state park trail into Windsor Locks.

The project will replace deteriorating pavement with asphalt. Suffield's earlier project summary called for a stone-dust surface, which would let more water soak through. Suffield First Selectman Colin Moll wrote in a September update published by The Suffield Observer that the town initially accepted the state Department of Energy and Environmental Protection's stone-dust plan. The transportation department required asphalt, and the town sought more funding to cover the change, Moll wrote.

Limited access for construction equipment, design changes and questions over which town had jurisdiction slowed the project, Zawistowski said. Her announcement gave no specific start date or closure schedule.

Zawistowski also thanked the Friends of the Windsor Locks Canal State Park, whose volunteers have cleared brush, removed invasive plants and helped maintain the trail.

For more Northern Connecticut news, follow Patch editor Jay Kenney.

More from Windsor Locks
News | 1d
News | 2d
News | 3d
See more on Patch >

Sign up for free local newsletters and alerts for the
Windsor Locks Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information