Politics & Government

Lake Forrest Drive Lane Closure Starts Monday

Sandy Springs contractors will be performing geotechnical sampling of the Lake Forrest Dam.

SANDY SPRINGS, GA -- A geotechnical investigation related to the Lake Forrest Dam will require the city of Sandy Springs to roll out lane closures along Lake Forrest Road.

City contractors will perform geotechnical sampling of the structure, resulting in a single lane closure on the road between between Forrest Lake Drive NW and Beverly Drive NW.

The closure will take place from 9 a.m. to 9 p.m. Monday, Aug. 29 to Sunday, Sept. 4.

Find out what's happening in Sandy Springsfor free with the latest updates from Patch.

Motorists can expect to see traffic control measures, including proper signage and flaggers, to help guide residents around the work zone.

Residents will have access to their homes at all times during construction. Motorists are urged to use caution and to avoid the area if possible.

Find out what's happening in Sandy Springsfor free with the latest updates from Patch.

---

Image via Patch

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.