Crime & Safety
Village to Present Results from Flood Study During Wednesday Meeting
The study was performed on the village's separated storm sewer system.

Submitted by the village of Arlington Heights
The village will be hosting a meeting on Wednesday, Feb 3, at 7:30 p.m. in the Board Room at 33 S. Arlington Heights Road.
The purpose of the meeting will be to present the findings of a study recently performed on the Village’s Separated Storm Sewer System. The study was performed by Christopher B. Burke Engineering and discusses the performance of the Village’s Separated Storm Sewer System that generally lies geographically north of Palatine Road and south of Central Road.
The meeting will consist of a presentation of the report findings by the Village’s consultant. After the presentation, breakout sessions will be conducted in which the report is broken down by neighborhoods. Exhibits will be on hand to make it easier for residents to see potential improvements identified in the report.
Find out what's happening in Arlington Heightsfor free with the latest updates from Patch.
Village staff will be present to take notes and moderate the sessions. The report is in a “final draft version” and will not be finalized until the Village Board and residents have had time to review the report and provide input. The Village Board will not be taking any action at this meeting.
The following is the Executive Summary of the report: Burke Flood Study Summary
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.