BRANDYWINE, MD — Work will start Friday on a $6.4 million bridge replacement project on MD 382 (Croom Road) that spans County Line Creek in Brandywine. Detours will be in place for the bridge to be removed and a new bridge to be constructed.
The project calls for the demolition and replacement of the existing two-lane bridge originally constructed in 1963. The new structure will feature a single-span concrete bridge that will be slightly wider than the existing bridge.
The detour will be in place until Aug. 22, weather permitting.
The detour will use Croom Road (MD 382), Aquasco Road/Brandywine Road (MD 381), Prince Frederick Road (MD 231), Leonardtown Road/Mattawoman Beantown Road (MD 5), Poplar Hill Road and Covington Road.
For a list of all major Maryland State Highway Administration projects, visit roads.maryland.gov.
Sign up for free local newsletters and alerts for the
Bowie, MD Patch
Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.