HAVRE DE GRACE, MD — A road paving project started Monday and will last at least seven days, possibly upwards of 20 days, that will require residents to not park in the street and avoid construction areas.
The project calls for the repair to inlets, replacement of curbs and gutters, a 2-inch mill of existing road surfaces and a 2-inch overlay. Patching of 3 to 5 inches may be needed in some areas, the Havre de Grace officials stated.
Residents should expect disruptions to traffic in and out of the neighborhoods listed below during work hours from 7 a.m. to 5 p.m.:
Sign up for free local newsletters and alerts for the
Havre de Grace Patch
Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.