Havre de Grace
News Feed
Events
Local Businesses
Classifieds
Traffic & Transit

Road Closures In Aberdeen Prompted By Sewer Repair Project

Work includes replacing sewer lines near South Drive and rehabilitating aging infrastructure in the Aberdeen Hills neighborhood.

ABERDEEN, MD — Sewer repairs are underway in Aberdeen as the city works to improve aging infrastructure, with road closures expected to continue in some areas through the end of November.

According to the Aberdeen Department of Public Works, sewer pipe and manhole lining started Nov. 16 as part of the city's ongoing sanitary sewer rehabilitation program.

Subscribe

The current project will focus primarily on repairing manholes and sewer service lines in the Aberdeen Hills neighborhood, along with sewer main repairs in other areas of the city.

City officials said routine inspections identified sewer lines and manholes needing repairs to address defects that can contribute to sewage backups, overflows and groundwater entering the sewer system.

Cleaning and inspection work has been completed, allowing crews to move forward with lining the pipes and manholes.

The work is part of the second year of the city's sewer rehabilitation program, which is expected to continue through June 30, 2027.

Meanwhile, a separate sewer replacement project is affecting drivers near South Drive.

The city has contracted DXI Construction to replace and increase the capacity of sewer lines in the South Drive area. Portions of South Drive are closed to all traffic while crews complete the improvements.

Streets affected by this project include:

The city expects the South Drive sewer improvements to be completed no later than Nov. 30.

Aberdeen also is preparing for another major infrastructure project in the Aberdeen Hills neighborhood. The city plans to replace approximately 4,500 linear feet of aging water mains, along with 32 valves, seven fire hydrants and 85 water service connections.

The work will affect areas near Shirley Drive, Ruby Drive, Doris Circle, Bernice Terrace and Marjorie Lane. According to the city, the existing cast-iron water pipes have experienced significant corrosion and mineral buildup that can affect water quality and system performance.

Construction is scheduled to start in March 2027. Residents may notice temporary paint markings identifying underground utilities as crews prepare for the project.

More from Havre de Grace
News | 3h
News | 3h
News | 5d
See more on Patch >

Sign up for free local newsletters and alerts for the
Havre de Grace Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information