Business & Tech
Firm Hired to Design Downtown Crossing Streetscape Plan
The project will look at sidewalks, roadways, pedestrian zones, signage and retail vendors.
The Boston Redevelopment Authority has selected a firm to develop a streetscape design program for Bostonβs Downtown Crossing Business Improvement District.
Klopfer Martin Design Group, located at 214 Cambridge St., Boston, was selected from 11 proposals submitted to the BRA for the project.
βAt the [Boston Improvement Districtβs] Annual Meeting, KMDGΒ presented its long-term visionΒ for a district-wide standard of design to be implemented in the public realm i.e. sidewalks, roadways, the pedestrian zone, signage, and the vending program,β according to a press release posted on the BRA website. βExperts in landscape architecture,Β wayfinding, urban design, universal design, vending, civil and traffic engineering, and bicycling have been assembled by KMDG to be incorporated into the standards.β
Find out what's happening in Back Bayfor free with the latest updates from Patch.
Through the Streetscape Design Standards and Wayfinding Program, the Boston Redevelopment Authority and Klopfer Martin Design Group will develop specifications for sidewalk and roadway materials, recommendations for the pedestrian zone and vending program and concept plans for the wayfinding program.
βIn response to changing demographics,Β KMDG will use urban design to βrecast the crossingβ as a public, open space. New wayfinding standards will be used to highlight intersections and opportunities to βconnect the connections,ββ according to the BRA website. βWayfinding components will include all modes of transportation (private motor vehicles, public transportation, bicycling, and pedestrians), informational kiosks, maps, and the areaβs history and culture to βunlock the experience.ββ
Find out what's happening in Back Bayfor free with the latest updates from Patch.
Also at the recent Boston Improvement District meeting, senior planner Jonathan Greeley presented a project that involves improvements to the crosswalks, streetlights, sidewalks and planter in the Kingston and Bedford Street intersection, also in the Downtown Crossing area.
Designs for that project will be finalized this month, according to the BRA site. Construction will be completed in late May.
