Traffic & Transit

Sewer Inspection Underway On Hyannis Main Street

Traffic on Main Street will be reduced to a single lane during the inspection, which should be completed by Wednesday.

News release from Town of Barnstable.

HYANNIS, MA — Starting Monday, October 16, 2023, the Town of Barnstable will perform routine sewer inspections along Main Street, Hyannis, from Center Street to South Street. Work will occur during the morning hours, between 7:00AM and 11:00AM, and is anticipated to be completed by Wednesday, October 18, 2023.

As a result, traffic on Main Street will be reduced to a single lane, within the vicinity of each inspection station. Traffic control will be onsite to assist motorists around the active work zone.

Find out what's happening in Barnstable-Hyannisfor free with the latest updates from Patch.

As always, please slow down and use extreme caution when traveling through road construction areas, and follow posted safety and detour signs. To review all current construction and real-time traffic advisories, please visit: Barnstable Water Resources at https://barnstablewaterresources.com/news-updates/ or Barnstable’s Waze Live Map at: https://www.waze.com/live-map

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.