Community Corner
Beaver Brook Bridge Work On Danvers Rail Trail Set To Begin
Construction of the extension bridge will start on Monday with some noise and temporary access disruption expected.

DANVERS, MA — Work is set to begin on Monday on the Danvers Rail Trail Extension Beaver Brook Bridge.
Work is expected to take place Mondays through Fridays from 7 a.m. to 4 p.m. — weather permitting — with some disruptions involving noise, vibrations, dust and temporary obstruction to trail access when the contract enters and exits the trail from Hobart Street and Beaver Park Road.
"We ask for your patience and cooperation while the contractor is working on the trail," the Danvers Department of Public Works said.
Find out what's happening in Danversfor free with the latest updates from Patch.
Aqua Line Utility Inc. was contracted to perform the work that will consist of the construction of the timber bridge structure, embankment stabilization, wooden guard rails and a stone dust pathway.
The Danvers Engineering Division plans to work with the contractor to minimize any disturbances while work is occurring on the trail.
Find out what's happening in Danversfor free with the latest updates from Patch.
More information can be found here.
Those with any questions should call the Danvers Engineering Division at 978-777-2668 Ext. 3635.
(Scott Souza is a Patch field editor covering Beverly, Danvers, Marblehead, Peabody, Salem and Swampscott. He can be reached at Scott.Souza@Patch.com. Twitter: @Scott_Souza.)
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.