This post was contributed by a community member. The views expressed here are the author's own.

Politics & Government

MassDOT to Hold Public Hearing in Natick Regarding Bridge Project

MassDOT will hold a Public Hearing to discuss the proposed Route 27 over Route 9 bridge replacement project in Natick.

BOSTON - The Massachusetts Department of Transportation (MassDOT) will hold a Public Hearing to discuss the proposed Route 27 over Route 9 bridge replacement project in Natick. The project includes the following improvements to the interchange of Route 9 and Route 27:

  • The existing three quadrant cloverleaf interchange will be modified to provide a partial cloverleaf configuration with auxiliary lanes on both eastbound and westbound Route 9;
  • The existing Route 27 bridge will be replaced with a new structure and will be widened to provide four travel lanes;
  • New traffic signals and drainage improvements;
  • New sidewalks; and
  • Minimum 5' bicycle accommodating shoulders on both Route 27 and Route 9.

The Hearing will take place on Thursday, June 8, at 7:00p.m. on the 2nd floor of Natick Town Hall, and is open to the public.

###

Find out what's happening in Natickfor free with the latest updates from Patch.

For More Information: Abigail Silverman (617) 722-2575

The views expressed in this post are the author's own. Want to post on Patch?

More from Natick