Traffic & Transit

Route 9 Repaving In Natick Begins This Weekend

The paving work will repair a bumpy stretch of Worcester Road, plus parts of Speen Street.

A pothole along Route 9 near the Route 27 interchange in winter 2019.
A pothole along Route 9 near the Route 27 interchange in winter 2019. (Neal McNamara/Patch)

NATICK, MA β€” A bumpy stretch of Route 9 in Natick will be repaved starting this weekend, according to MassDOT.

A stretch of the road between the Framingham line and Walnut Street has been milled in preparation for the project. MassDOT expects to begin repaving work on Sunday, according to a spokeswoman.

On top of the Route 9 work, MassDOT crews will also repave Speen Street between the Ethan Allen store and south to Hartford Road. The Route 9-Speen Street ramps will also be repaved, according to the state.

Find out what's happening in Natickfor free with the latest updates from Patch.

The length of Route 9 from Walnuts street to Southborough was last resurfaced about a decade ago under the previous American Recovery and Reinvestment Act (ARRA) federal stimulus program.