Traffic & Transit

Route 128 North To Close In Peabody Stretch Overnight Thursday

Temporary lane closures will begin at 8 p.m. with a full closure of at least 20 minutes between 1 and 4 a.m. Friday.

PEABODY, MA — Drivers traveling on Route 128 northbound and southbound through the North Shore Thursday night should anticipate rolling lane closures with a temporary complete shutdown of the highway for about 20 minutes early Friday morning.

The state Department of Transportation said the lane closures will occur in the Peabody stretch from Exit 39 to Exit 40A beginning at 8 p.m. Thursday and lasting until 5 a.m. on Friday. Between 1 and 4 a.m. Friday there will be a complete closure of the highway for a minimum of 20 minutes.

The temporary lane closures are necessary to allow the contractor to install a VMS (variable-message sign) structure safely and effectively at this location. The full highway closure is to allow for the placement of an overhead VMS sign and structure.

Find out what's happening in Peabodyfor free with the latest updates from Patch.

Drivers traveling through the affected areas should expect delays, reduce speed and use caution. Work is subject to weather conditions.

The work is being conducted as part of a $3.1 million project for Intelligent Transportation Systems improvements throughout District 4.

Find out what's happening in Peabodyfor free with the latest updates from Patch.

(Scott Souza is a Patch field editor covering Beverly, Danvers, Marblehead, Peabody, Salem and Swampscott. He can be reached at Scott.Souza@Patch.com. Twitter: @Scott_Souza.)

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.