Politics & Government

Parkway Installs First Solar Panel Tuesday

The Parkway School District's first of 33 solar panels goes in Tuesday at Barretts Elementary School in Manchester.

According to the Parkway School District, this is the first and largest school solar project in the state of Missouri.

As previously reported by Patch, Parkway is intallingΒ 33 buildings with solar panels and the installation process is expected to take four to six months.

Barretts Elementary SchoolΒ is the first school to receive the panels Tuesday morning.

Find out what's happening in Ballwin-Ellisvillefor free with the latest updates from Patch.

,Β fromΒ Brightergy Solar SolutionsΒ for $72,300 a year, over 20 years. The panels willΒ generate energy for electricity, according to the district.

Cindy Bambini withΒ BrightergyΒ tellsΒ PatchΒ the district is installing 3,267 solar panels that will be used to help generate power all 33 buildings. They're estimated to save as much energy as used by 1,243 light bulbs.Β 

Find out what's happening in Ballwin-Ellisvillefor free with the latest updates from Patch.

(Check out Bambini's blog post: Reporting Live From The Sunny Side of The Parkway Schools....)

The panels will save the district an estimated $14,194 the first year and has no up front installation cost,Β Parkway School District Spokesperson Cathy KellyΒ previously toldΒ Patch. She saidΒ savings could reach more than $1.4 million over the life of the contract which runs until 2033.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

More from Ballwin-Ellisville