Traffic & Transit

Multiple Bridgewater Roads To Be Resurfaced

Here is a list of the most up-to-date schedule for various roads in the township to be milled and paved.

BRIDGEWATER, NJ — Multiple roads in Bridgewater are slated to receive a face-lift. Here is a list of the most up-to-date schedule for various roads in the township to be resurfaced.

Milling and paving will be conducted between 7 a.m. to 5 p.m.:

  • July 27 to Aug. 1: Walters Brook Drive from Milltown Road to Vanderveer Road
  • July 30: Adamsville Road N. from Rt. 22 to end
  • July 31 to 3: Vanderveer Road from Milltown Road to Murphy Drive
  • Aug. 2 to 7: Thruway Drive from Talamini Road to Garretson Road
  • Aug. 7 to 8: Meadow Road from Great Hills Road to Township Boundary
  • Aug. 8 to 9: Brown Road from Tall Oaks Drive to Papen Road
  • Aug. 9 to 10: Adamsville Road N. from Rt. 28 to E. Main St. and Adamsville Road S. from E. Main St. to Central Ave.
  • Aug. 10 to 13: Foothill Road from Finderne Ave. to Chimney Rock Rd.

All schedules are subject to change weather permitting.

Find out what's happening in Bridgewaterfor free with the latest updates from Patch.

Drivers should prepare accordingly as travel times may be impacted and seek alternate routes if needed.

(Image via Shutterstock)

Find out what's happening in Bridgewaterfor free with the latest updates from Patch.

Have a news tip? Email alexis.tarrazi@patch.com.

Get Patch breaking news alerts sent right to your phone with our new app. Download here.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.