Randolph, NJ
News Feed
Events
Local Businesses
Classifieds
Community Corner

Randolph Paving Morris Turnpike. Here's What To Know

Milling begins May 15; paving follows May 18–19 in two segments, weather permitting, with traffic control measures in place throughout.

RANDOLPH, NJ - Randolph Township will mill and pave Morris Turnpike from Sussex Turnpike to Dover Chester Road over three days beginning Friday, weather permitting.

The tentative schedule is as follows: milling of the entire length on Friday; paving from Dover Chester Road to Carrell Road on Monday, May 18; and paving from Carrell Road to Sussex Turnpike on Tuesday, May 19.

Subscribe

Construction will require limited access to Morris Turnpike and adjacent streets on each work day. Signs, police and traffic control measures will be in place.

Residents should also be aware that garbage and recycling pickup may be affected on paving days. Blue Diamond will make every effort to collect on schedule but will do so before 6 a.m. — residents are asked to have trash and recycling out the night before their scheduled pickup day.

Updates will be posted to the township website at randolphnj.org and on social media. Residents can also sign up for alerts through the township's Notify Me system at randolphnj.org/145/Sign-Up-For.

Questions about the project can be directed to the Engineering Department at (973) 989-7066.

Have a correction or news tip? Email sarah.salvadore@patch.com

More from Randolph, NJ
News | 15h
News | 1d
See more on Patch >

Sign up for free local newsletters and alerts for the
Randolph, NJ Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information