Ditmas Park
News Feed
Events
Local Businesses
Classifieds
Crime & Safety

Flatbush Building Ordered Demolished After Deadly Collapse

The City is also inspecting 160 construction sites tied to the collapse, with several projects already facing stop-work orders.

| Updated
Firefighters dig through rubble after NYC building collapse kills 1 and traps people in wreckage First responders work the scene after a building collapsed in the Brooklyn borough of New York, Wednesday, Nov. 11, 2026. (AP Photo/Ryan Murphy)

FLATBUSH— The City ordered the demolition of the collapsed Flatbush apartment building after inspectors determined its condition had deteriorated beyond repair, leaving the structure too dangerous to save.

The emergency demolition order covers 1323 Flatbush Ave., between Glenwood Road and Avenue H.

Subscribe

The building sustained extensive damage Nov. 11 when a neighboring apartment building at 1321 Flatbush Ave. collapsed in the opposite direction, falling into a construction site at 2625 Bedford Ave.

Exposed rooms have remained visible from the street since the disaster.

Residents cannot return to retrieve their belongings because unstable floors and potential asbestos contamination pose additional hazards, according to the Buildings Department.

The City has fenced off the surrounding area and plans to reinforce the neighboring building at 1325 Flatbush Ave. before demolition begins.

Reinforcement work is expected to start this week, but officials have not announced a demolition date.

The American Red Cross is providing displaced residents with hotel accommodations through at least the end of November.

Investigators have not determined what caused the Nov. 11 collapse.

The Buildings Department is inspecting more than 160 construction sites across the city connected to the companies and professionals involved in the excavation at 2625 Bedford Ave.

The safety investigation has also prompted inspectors to halt construction, either fully or partially, at projects connected to two engineers who worked on the Flatbush excavation.

The broader inspection effort targets projects involving six firms and about 160 construction sites, Mayor Zohran Mamdani announced.

The two engineers under scrutiny are Jieming Wang, whose New Jersey-based company, LMW Engineering Group, prepared structural plans for the Flatbush excavation, and MD Ariful Islam, whose Queens-based company, RI Consulting Services, handled safety monitoring and structural plans on construction projects.

Wang submitted the structural drawings for supporting neighboring buildings during excavation at 2625 Bedford Ave.

City plan examiners approved the drawings, which did not specify steel bracing or underpinning, a construction method used to strengthen existing foundations, at the collapse site.

Islam served as a special inspector responsible for monitoring excavation and shoring work.

He submitted a request to withdraw from the project Nov. 12, one day after the collapse.

Among the projects receiving partial stop-work orders were a Greenwich Village parking garage conversion into luxury condominiums and a planned six-story apartment building beside the 7 train tracks in Woodside, Queens.

Only one of the five projects receiving stop-work orders involved excavation, the central focus of the Flatbush collapse investigation.

An inspector returned Tuesday and issued a full stop-work order after the project's general contractor refused an inspection and ordered the inspector to leave.

The inspector documented the confrontation in a complaint filed with the Buildings Department, reporting that the contractor threatened to lock the inspector inside the property.

More from Ditmas Park
News | 48m
News | 1d
News | 1d
See more on Patch >

Sign up for free local newsletters and alerts for the
Ditmas Park Patch

Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.

©2026 Patch Media. All Rights Reserved

Do Not Sell My Personal Information