Home & Garden

Thruway Lane Closures Overnight Sept. 11, 14-18

Sensors are being installed for the temporary electronic toll system.

Construction of the project’s temporary all-electronic toll collection system in Rockland County is continuing with the installation of roadway sensors during the week of Sept. 14.

“Following a series of tests this fall, the system will be activated in spring 2016, enabling motorists to pay their toll while maintaining highway speeds. Like the Model-T and the 8-track tape player, the inconvenience of stopping or slowing down to pay a toll soon will be a thing of the past,” the New NY Bridge Team posted.

When the temporary all-electronic toll system goes into service, the Tarrytown plaza will be closed and a new, permanent AETC gantry will be built in its location.

Find out what's happening in Nyack-Piermontfor free with the latest updates from Patch.

Specific lane and ramp closure times are listed in the chart below.

I-287/I-87 LANE AND RAMP CLOSURES NEAR THE TAPPAN ZEE BRIDGE:

Find out what's happening in Nyack-Piermontfor free with the latest updates from Patch.

  • Fri., 9/11: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Sat., 9/12. Southbound from exits 12 to 10
  • Mon., 9/14: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Tue., 9/15. Southbound from exits 12 to 10
  • Tue., 9/15: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Wed., 9/16. Southbound from exits 12 to 10
  • Wed., 9/16: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Thu., 9/17. Southbound from exits 12 to 10
  • Thu., 9/17: 9 p.m. – One right lane; 10 p.m. – Two right lanes. Ends: 6 a.m., Fri, 9/18. Southbound from exits 12 to 10
  • Fri., 9/18: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Sat., 9/19. Southbound from exits 12 to 10

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.