Home & Garden
Thruway Lane Closures Overnight Sept. 11, 14-18
Sensors are being installed for the temporary electronic toll system.
Construction of the project’s temporary all-electronic toll collection system in Rockland County is continuing with the installation of roadway sensors during the week of Sept. 14.
“Following a series of tests this fall, the system will be activated in spring 2016, enabling motorists to pay their toll while maintaining highway speeds. Like the Model-T and the 8-track tape player, the inconvenience of stopping or slowing down to pay a toll soon will be a thing of the past,” the New NY Bridge Team posted.
When the temporary all-electronic toll system goes into service, the Tarrytown plaza will be closed and a new, permanent AETC gantry will be built in its location.
Find out what's happening in Pearl Riverfor free with the latest updates from Patch.
Specific lane and ramp closure times are listed in the chart below.
I-287/I-87 LANE AND RAMP CLOSURES NEAR THE TAPPAN ZEE BRIDGE:
Find out what's happening in Pearl Riverfor free with the latest updates from Patch.
- Fri., 9/11: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Sat., 9/12. Southbound from exits 12 to 10
- Mon., 9/14: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Tue., 9/15. Southbound from exits 12 to 10
- Tue., 9/15: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Wed., 9/16. Southbound from exits 12 to 10
- Wed., 9/16: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Thu., 9/17. Southbound from exits 12 to 10
- Thu., 9/17: 9 p.m. – One right lane; 10 p.m. – Two right lanes. Ends: 6 a.m., Fri, 9/18. Southbound from exits 12 to 10
- Fri., 9/18: 8 p.m. – One right lane; 9 p.m. – Two right lanes. Ends 6 a.m., Sat., 9/19. Southbound from exits 12 to 10
PHOTO: New York Thruway Authority
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.