Schools

Conestoga High School Expansion Project Design Approved

The proposed design will cost between $33 to $39 million after the school board gave the OK to designs featuring classrooms, labs, and more.

BERWYN, PA — As the Tredyffrin/Easttown School District looks to expand Conestoga High School, the district's Board of School Directors approved the design plan for the Conestoga High School Expansion Project and the fee proposal from the project architects on Jan. 28.

The preliminary cost estimate for the expansion project is in the range of $33 to $39 million.

Five design concepts were contemplated by the board. The plans were eventually narrowed down to two options: one that involved a courtyard and one that included an atrium.

Find out what's happening in Tredyffrin-Easttownfor free with the latest updates from Patch.

The board approved the design plan that includes an atrium. The district has an on-going goal of ensuring that district facilities are adequate to deliver both current programs and forecasted new programs for district students.

As a result of increasing student enrollment, the district determined there is a need to expand Conestoga High School and add additional space to include eight additional regular classrooms, two additional special education classrooms, four additional science labs, one additional art room, one additional kitchen, a fabrication lab, a large flexible learning space, and additional smaller spaces for meetings, offices and small group instruction.

Find out what's happening in Tredyffrin-Easttownfor free with the latest updates from Patch.

The school is also in need of expanded spaces in the nurse suite, library, cafeteria, student services suite, and health and fitness room. The construction phase of the expansion project is projected to begin in January 2020 and with anticipated completion in 2022.

Over the course of the last year, the district has conducted a Conestoga High School facility study to examine the district's instructional needs, space utilization and possible options for expansion of the current building. The expansion project has been discussed at School Board Education, Facilities and Finance Committee meetings and at regular Board meetings.

On Jan. 24, the public was invited to meet with school board members, the TESD administration and project architects for coffee and conversation about the design plans for the Conestoga High School Expansion Project.

Community members asked questions and shared ideas. At its Jan. 28 meeting, the Board authorized the project architects to create detailed design schematics for the expansion project plan.

For more information, visit the Conestoga High School Expansion Project webpage here. The page includes updates on the Conestoga High School Expansion Project, as well as presentation materials and resources.

Above, school board members discuss design plans for the Conestoga High School Expansion Project at a special Open House on Jan. 24.

Image via Tredyffrin-Easttown School District

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.