Politics & Government
Tredyffrin Township: Pennsylvania Turnpike Roadway & Bridge Reconstruction From MP 324.65 To MP 326.18 - Trumbull Corporation
Thomas Road, which takes traffic under the PA Turnpike 1-76 in Tredyffrin Township, will be closed at times as part of this project. Tra ...
09/14/2021 8:23 AM
Traffic restrictions on 1-76 PA Turnpike will begin on September 27, 2021 and will continue through May 2025. Two lanes of traffic in each direction will be maintained during peak hours with nightly single lane and shoulder restrictions occurring.
Find out what's happening in Tredyffrin-Easttownfor free with the latest updates from Patch.
Thomas Road, which takes traffic under the PA Turnpike 1-76 in Tredyffrin Township, will be closed at times as part of this project. Traffic will be detoured around the work area via Gulph, Glenhardie and Walker Roads. A separate detour notice will be distributed at least 2 weeks prior to any Thomas Road closures and will provide additional information regarding the detour.
Both Thomas and Glenhardie Roads will be restricted to a single lane pattern operated by a traffic signal for portions of the overhead turnpike bridge demolition and reconstruction.
Find out what's happening in Tredyffrin-Easttownfor free with the latest updates from Patch.
Please visit the following website for more information on the Pennsylvania Turnpike Reconstruction Project from Milepost 324.65 to 326.18. https://www.patpconstruction.com/mp324to326/
This press release was produced by the Tredyffrin Township. The views expressed here are the author’s own.