
The Pennsylvania Department of Transportation has scheduled road work in South Whitehall, Upper Macungie and North Whitehall:
Upper Macungie
- Road: Route 100 between Industrial Boulevard and Interstate 78
- Type of Work: Roadway base repairs
- Date: Monday, Oct. 15, through Wednesday, Oct. 17, from 7 a.m. to 3 p.m.
- Restriction: Lane restrictions. Expect delays. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
Find out what's happening in Upper Macungiefor free with the latest updates from Patch.
- Road: Route 222 at Grim Road
- Type of Work: Roadway base repairs
- Date: Thursday, Oct. 18, from 7 a.m. to 3 p.m.
- Restriction: Lane restrictions. Expect delays. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
South Whitehall
Find out what's happening in Upper Macungiefor free with the latest updates from Patch.
- Road: Route 309 North Ramp to Tilghman Street West
- Type of Work: Milling
- Date: Thursday, Oct. 18, from 9 a.m. to 2 p.m.
- Restriction: Lane restrictions. Expect delays. Motorists are urged to use caution when traveling through work areas.
- Rain will cause delays.
- Road: Perma Avenue/Whitehall Avenue between Mauch Chunk Road and Walbert Avenue
- Type of Work: Crack sealing
- Date: Monday, Oct. 15, from 7 a.m. to 3 p.m.
- Restriction: Lane restrictions with flagging. Expect delays. Motorists are urged to use caution when traveling through work areas.
- Rain will cause delays.
- Road: Route 22 East Ramp to Route 309 South
- Type of Work: Pothole patching
- Date: Friday, Oct. 19, from 9 a.m. to 2 p.m.
- Restriction: Lane restrictions. Expect delays. Motorists are urged to use caution when traveling through work areas.
- Rain will cause delays.
North Whitehall
- Road: Scheidys Road between Route 329 and Neffs-Laury Road
- Type of Work: Crack sealing
- Date: Tuesday, Oct. 16, from 7 a.m. to 3 p.m.
- Restriction: Lane restrictions with flagging. Expect delays. Motorists are urged to use caution when traveling through work areas.
- Rain will cause delays.
- Road: Mauch Chunk Road between Sand Spring Road and Hill Street
- Type of Work: Paving
- Date: Now through Oct. 31, 7 a.m. to 6 p.m.
- Restriction: Lane restrictions with flagging.
- Rain will cause delays.
- Road: Route 329 between Rick Road and Cobbler Road
- Type of Work: Paving
- Date: Now through Oct. 31, from 7 a.m. to 6 p.m.
- Restriction: Lane restrictions with flagging.
- Rain will cause delays.
- Road: Willow Lane between Shelby Drive and Bridge Street
- Type of Work: Paving
- Date: Through Oct. 31, from 7 a.m. to 6 p.m.
- Restriction: Lane restrictions with flagging.
- Rain will cause delays.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.