Politics & Government

City Of Gig Harbor: Notice Of Determination Of Nonsignificance

WOLLOCHET INTERCHANGE SELF-STORAGE FACILITY | PL-SEPA-20-0001 The proposal includes the construction of five buildings totaling approxim ...

September 23, 2021

WOLLOCHET INTERCHANGE SELF-STORAGE FACILITY | PL-SEPA-20-0001

Find out what's happening in Gig Harborfor free with the latest updates from Patch.

The proposal includes the construction of five buildings totaling approximately 102,371 gross square feet, (buildings A – E).  The applicant is proposing a mix of storage lockers ranging in size from 25 square feet to over 250 square feet.  Building A is proposed for heated units with 4 covered loading bays and elevator access to three floors.  Building B is proposed for a mix of interior heated lockers and exterior unheated lockers. Buildings C, D and E are all exterior access lockers and unheated.  Six off-street parking stalls are proposed along the south side of Building A, where the administrative office is also proposed to be located. The applicant also proposes 11 off-street vehicle loading berths. Vehicular access is proposed via a new driveway off of Wollochet Dr.


This press release was produced by the City of Gig Harbor. The views expressed here are the author’s own.

Find out what's happening in Gig Harborfor free with the latest updates from Patch.

More from Gig Harbor