Politics & Government
City Of Gig Harbor: Notice Of Determination Of Nonsignificance
WOLLOCHET INTERCHANGE SELF-STORAGE FACILITY | PL-SEPA-20-0001 The proposal includes the construction of five buildings totaling approxim ...
September 23, 2021
WOLLOCHET INTERCHANGE SELF-STORAGE FACILITY | PL-SEPA-20-0001
Find out what's happening in Gig Harborfor free with the latest updates from Patch.
The proposal includes the construction of five buildings totaling approximately 102,371 gross square feet, (buildings A – E). The applicant is proposing a mix of storage lockers ranging in size from 25 square feet to over 250 square feet. Building A is proposed for heated units with 4 covered loading bays and elevator access to three floors. Building B is proposed for a mix of interior heated lockers and exterior unheated lockers. Buildings C, D and E are all exterior access lockers and unheated. Six off-street parking stalls are proposed along the south side of Building A, where the administrative office is also proposed to be located. The applicant also proposes 11 off-street vehicle loading berths. Vehicular access is proposed via a new driveway off of Wollochet Dr.
This press release was produced by the City of Gig Harbor. The views expressed here are the author’s own.