Politics & Government

Village Of Saukville: Colonial Pkwy Reconstruction Project

The Colonial Pkwy Reconstruction Project is estimated to begin Thursday, Sept. 23rd. The project includes the pulverization and repaving ...

(Village of Saukville)

September 20, 2021

The Colonial Pkwy Reconstruction Project is estimated to begin Thursday, Sept. 23rd.  The project includes the pulverization and repaving of the roadway, spot replacement of curb & gutter, driveway approaches and sidewalks, new ADA ramps at the intersections, and replacing existing storm sewer and storm inlets.

Find out what's happening in Port Washington-Saukvillefor free with the latest updates from Patch.

The actual pulverization of Colonial Pkwy is scheduled to occur on October 9th with paving happening on October 13th & 14th, weather permitting.  

Signage will be placed to limit traffic to local residents only.  The roadway will be drivable when it is pulverized.

Find out what's happening in Port Washington-Saukvillefor free with the latest updates from Patch.


This press release was produced by the Village of Saukville. The views expressed here are the author’s own.

More from Port Washington-Saukville