TRAFFIC ALERT: A heads up to another major closure related to the 60 Truck Lanes Project.
The crash sparked a small brush fire, officials said.
UPDATED: The CHP says a person driving a Corvette tried to use a closed lane to pass a big rig, but instead hit it and then another vehicle.
If your travel takes you via the Badlands, be sure to plan ahead and expect delays.
Caltrans District 8 officials announced the 24/7 escorts on Highway 74 between Hemet and Mountain Center.
Updates are expected on progress repairing state Route 74 through the national forest and state Route 243 between Idyllwild and Banning.
The "60 Swarm" continues this weekend, with another major closure. Motorists are urged to plan ahead.
The 24/7 closure of one westbound lane was set to begin the night of Aug. 22, according to county transportation officials.
The head-on crash was reported early Sunday morning.
Crews will close the entire eastbound 60 near Riverside for a stretch that's roughly 13 miles long.
If your commute takes you from Beaumont via the Badlands, anticipate delays with this major closure.
TRAFFIC ALERT: The work is set for Wednesday into Thursday, according to Caltrans.
The Ramona Expressway was closed for several hours as a result of the deadly wreck.
Heads up, motorists! Plan ahead for the "60 Swarm."
The crash happened in the area of Sanderson Avenue and the Ramona Expressway.
The crash happened early Wednesday morning, according to the California Highway Patrol.
One person was temporarily trapped in the wreckage of the weekend crash, officials reported.
Caltrans is urging motorists to plan ahead if your Inland Empire route passes this way.
Half of the Pomona (60) Freeway between Riverside and Ontario will be shut down Friday night and remain closed until Monday morning.
The sheriff's department reports that one child died shortly after the crash, while the other died the next day.
The roadway provides connectivity to Interstate 10 and State Route 62 in the communities near Palm Springs and Desert Hot Springs.
Headed west on the 10? Plan for some delays.
The Oak Valley Signalization Project is wrapping up — but there's a major closure planned on Thursday.
Some closures are planned this week as the city works on completing the Oak Valley Signalization Project.
The $150,000 barrier project is slated to conclude by the end of this month.
The CHP says a big rig hauling 40,000 pounds of a buttery vegetable spread flipped.
BREAKING: Motorists are urged to steer clear.
Beaumont motorists should plan ahead for these closures.
The closures are necessary for the preparation and paving of the Oak Valley overcrossing, city officials say.
For just a quarter, youth passengers can ride routes 3, 4 and 3/4.
UPDATED: All eastbound lanes of traffic headed into Beaumont were blocked by the wreck for about an hour.
The emergency repair projects are costing the state close to $10 million.
UPDATED: The CHP says a man crashed into a tree after losing control of his car.
Three vehicles were involved in the wreck, officials reported.
UPDATED: Officials temporarily closed the roadway at SR-79 as a result of the wreck. It has since reopened.
Major thoroughfares, including Gene Autry Trail, Indian Canyon Drive and Palm Canyon, are all on the list for extensive renovations.
A rental truck and a tractor-trailer collided on the 10 Freeway early Friday morning, resulting in a diesel fuel spill and lane closures.
A large sinkhole has resulted in the closure of a stretch of road between SR-60 and SR-79.
The promotion will offer free fare on all Beaumont and Banning Pass Transit routes, including fixed route and commuter links.
Commuter Link 120 connects the Pass Area with Metrolink and the San Bernardino Transit Center Monday – Saturday.