Politics & Government

City Of Davis: Slurry Seal Pavement Improvement Starts Sat., 9/25 - Second St And Cantrill Dr Impacted

See the latest announcement from the City Of Davis.

September 22, 2021 11:37 am

The annual pavement improvement project is moving into slurry seal treatment for some areas in town, which will result in a full road closure or half the road at a given time. Residents and businesses directly affected by this work will receive notices. 

Find out what's happening in Davisfor free with the latest updates from Patch.

This year, many of the areas receiving pavement treatments are used by many residents and visitors, so we are sending out this noticing on social media citywide. 

SLURRY SEAL LOCATIONS

Find out what's happening in Davisfor free with the latest updates from Patch.

Saturday, 9/25
• Cantrill Dr from Second St to Fifth St (AM Southbound lane, PM Northbound lane)
• Chiles Road from the roundabout at Cowell to the Dave Pelz overcrossing (full closure). Detours will be in place to use Cowell Blvd to travel east and west. This work will be done in the morning and will be closed for a period of 4-5 hours. 
• Second St from Pole Line Rd Overcrossing to Cantrill Dr (AM eastbound lane, PM westbound lane); businesses on the north side of Second Street between Pole Line Rd and Cantrill Dr will be accessible the entire day, however vehicles may be delayed from entering and exiting the driveways between 12 p.m. and 5 p.m. In the afternoon, customers and staff who need to go to these businesses may want to park in the Toad Hollow Dog Park lot or on Second St in front of the park and walk to the business to avoid delays. Please approach or depart from these businesses via L St (on approach, you will need to turn around to park near the dog park); there is a full closure further down the street at Cantrill and Pena.
• Second Street from Cantrill Dr to Pena Dr (full closure). This work will be done in the afternoon and will be closed for a period of 4-5 hours.
• Second Street from Faraday Ave to just before Target mall (AM Eastbound lane; PM Westbound lane closures)

We realize this work on Second St. and Cantrill Dr. may impact businesses for a short period of time, however this pavement improvement must be done, and these plans will provide the least amount of impact to the community as a whole.

Monday, 9/27
• Alvarado Ave from Bella Casa St to Catalina Dr (split roadway, flaggers)
• Arlington Blvd from Shasta Dr to Humboldt Dr – near Emerson Jr High; (one lane, flaggers)
• Bella Casa St from Alvarado Ave to Alta Loma Dr (closure)
• Coolidge from Alameda Ave to Amador Ave (closure)
• Cowell Blvd at Schmeiser – near Pioneer Elementary (outside lanes only)
• East 8th St from 2300 block to 2400 block (near Davis Cemetery); (split roadway, flaggers)
• Emerald Bay from Rainier St to Danbury St (full closure)
• Grande Ave from F St to 200 block Grande Ave (outside lanes only)
• Lillard Ave from 3600 block Lillard to Ohlone St (closure)
• Rockwell Dr from Moore Blvd East to 2200 Block of Rockwell Dr (closure)
• Vista Way from Ensenada Dr to El Macero Dr (closure)

Tuesday, 9/28
• Alta Loma St from Alvarado Ave to Bella Casa St (closure)
• Alvarado Ave from Bella Casa St to Catalina Dr (split roadway, flaggers)
• Alvarado Ave from Catalina Dr to Alta Loma St (closure)
• Arlington Blvd from Shasta Dr to Humboldt Dr – near Emerson Jr High (one lane, flaggers)
• Coolidge from Amador Ave to Calaveras Ave (closure)
• Cowell Blvd at Schmeiser – near Pioneer Elementary (inside lanes only)
• Decatur Court off Concord Ave (court residents: please park on Concord if you need to get out that day)
• Grande Ave from F St to 200 Grande Ave (inside lanes only)
• Montgomery Ave from Danbury St to Rialto Ln (morning closure)
• Montgomery Ave from Rialto Ln to Regatta Dr (afternoon closure)
• Rockwell Dr from 2200 block Rockwell to Moore Blvd West (closure)
• Vista Way from Washoe St to Ensenada Dr (closure)

Many streets set for slurry seal will be closed to through traffic (unless otherwise noted). Construction hours are from 7:00 a.m. to 5:00 p.m. 

If your home or business is near repair work with a full closure, you will not be able to park your car on the street (you can park in your own driveway or parking lot). Please park on an adjacent street if you need to get out after 7 a.m. 

“No Parking” signs will be placed along the street at least 72 hours prior to the work being started. These signs will have specific dates and times for which all parking on the street will be restricted. ANY CARS PARKED WITHIN THE POSTED “NO PARK” AREA ON THE DAY THE STREET SURFACE TREATMENT WILL BE TOWED. 

If you have questions regarding any of this work, please contact Melissa Marshall at mmarshall@cityofdavis.org.


This press release was produced by the City Of Davis. The views expressed here are the author’s own.

More from Davis