Traffic & Transit
US-101 NB Central San Rafael Off-Ramp Bridge Replacement (CalTrans) In City Of San Rafael
They are still working on the fourth lane that will be a dedicated right turn pocket onto Second Street.
November 1, 2021
Caltrans and their contract Gordan N Ball have removed the temporary bridge that was placed on the 101NB Central San Rafael offramp and returned the third lane of traffic to operation. They are still working on the fourth lane that will be a dedicated right turn pocket onto Second Street.
Find out what's happening in San Rafaelfor free with the latest updates from Patch.
This press release was produced by the City of San Rafael. The views expressed here are the author’s own.