Sports

Almost Ready To Roll At SHS' Palmer Field

https://patch.com/img/cdn/users/1713316/2013/07/raw/145f7916bc5e5f8f852a9b0ffa3df63a.jpg

The 'Legion' turf is about to be rolled out and onto the rebuilt Donald E Palmer Field at Stonington High School.

Rolls of turf in alternating shades of light and dark green are stacked and ready to 'roll' or in this case, be rolled.

The $1,066,219 project also includes a structural strengthening of the surface. Existing sprinkler systems installed in the current natural-grass field will be ripped out.

The project should be completed in time for football!