Neighbor News
New Bedford News Media Matches Brian Williams
New Bedford Ocean Terminal- Social Media vs Main Steam Media

New Bedford News Media Matches Brian Williams
Brian Williams-Social Media- New Bedford Ocean Terminal
New Bedford, Massachusetts
February 8,2015
Folks , Brian Williams an American “journalist” “anchor” and managing editor of NBC was caught lying to the public in news broadcast to the entire nation. He’s not the only one. Your local news groups are guilty of lying through omissions.
A local Massachusetts newspaper blames “social media” for the downfall of Brian Williams. You have got to ask why the old mainstream media calls the social media a problem. They don’t like it when a story can be spread so fast and many people can have an opinion or share a version so quickly. They lose control of what information they want you to have.
For quite some time I have been saying industrial wind turbines are a bunco scheme of enormous consequence and people who value intellectual honesty should not be fleeced by their government.
The New Bedford Marine Commerce Terminal is a financial fiasco. Your politicians have been lying to you and the news media has been going along with the lies and distortions
Former Governor Patrick through his administration got Massachusetts in debt to 800 million dollars building wind turbines and wind turbine related sites like the Charlestown wind blade testing site and the incomplete New Bedford ocean wind turbine port that had already been built at Quonset Point, Rhode Island.
Massachusetts taxpayers are subsidizing the offshore wind turbine industry and all your news media and political figures are pulling the wool over your eyes.
In order to build the New Bedford ocean wind turbine port taxpayers were told by Governor Patrick in 2010 the port would cost 35 million. Today the port costs are nearing 135 million and the owners of the port the Massachusetts Clean Energy Center refuse to comment on costs, completion dates and a lease prematurely written to Cape Wind in September of 2014 for 187,500.00 per month. The port was leased before the final costs and completion dates.
Your local and state politicians accompanied by the news media went to visit the port of Bremerhaven, Germany an offshore wind turbine port prior to building the New Bedford ocean wind port. They came back and told you nothing but good news.
What the heck were they looking at ? Bremerhaven is a port located right on the ocean with a 3000 foot access similar to Quonset Point , Rhode Island. New Bedford has a 150 foot wide opening at the hurricane gates with only a 120 foot wide legal clearance. The news media and politicians turned the story around telling you New Bedford is a protected harbor with a hurricane gate but left off the fact that most wind turbine Jack Up barges world wide don’t fit through the narrow opening at the gates. The entrance is too small for a wind turbine port.
The news media and politicians continue to tout the ocean port in Bremerhaven, Germany but what they won’t tell you is the layoffs and anyone left is a part time worker. The Bard 1 offshore wind project is another financial fiasco with massive failures of the electric service platforms unable to send reliable power back to shore.
The sly n ews media and politicians continue hiding on an ongoing agenda the incomplete work at the New Bedford ocean wind port or South Terminal or what ever new name they call it to hide the fiasco..
Today the rail link to the terminal is a half mile away. The outer federal channel outside the narrow hurricane gates needs dredging. An AM radio station needs to be moved off four acres. There are no service cranes at the site.
In a couple of weeks the news media and your politicians are going to announce the project complete.
Would you ever get this news from the main stream media ? Or should I say would you ever get the truth ?