PALMYRA, NJ — The threat of dangerous weather conditions has postponed maintenance on the Tacony-Palmyra Bridge until Aug. 3, the Burlington County Bridge Commission said.
The path was shut overnight and was scheduled to close again to vehicle and pedestrian traffic at 9 p.m. on Tuesday.
These parameters will now be in effect on Monday, Aug. 3, from 9 p.m. to 5 a.m. on Aug. 4.
Maritime traffic will operate as normal.
The work schedule is subject to change due to weather or other factors.
MORE FROM PATCH: Hazmat Situation Breaks Out After Fire In South Jersey, Officials Say
HAVE A STORY IDEA OR NEWS TO SHARE? Contact Editor Eddie Callahan at edward.callahan@patch.com to connect with Patch in your area.
Sign up for free local newsletters and alerts for the
Moorestown Patch
Patch.com is the nationwide leader in hyperlocal news.
Visit Patch.com to find your town today.