Traffic & Transit
Pothole Repair Work Resuming Next Week Across Philadelphia
PennDOT and contractor crews will be addressing deteriorated conditions on nearly two dozen roads across Philadelphia next week.
PHILADELPHIA — Nearly two dozen roads across Philadelphia will have potholes repaired next week, according to PennDOT.
PennDOT and contractor crews will be working to fix deteriorated roads across the region next week, with 23 roads in Philly among them.
Crews will restrict travel lanes on these state highways to patch areas of deteriorating pavement.
Find out what's happening in Philadelphiafor free with the latest updates from Patch.
Drivers are advised to be alert of this moving operation and to expect intermittent lane closures and possible slowdowns when driving near work crews.
All activities are weather dependent.
Find out what's happening in Philadelphiafor free with the latest updates from Patch.
Below are Philadelphia roads being addressed next week:
- Interstate 95 and ramps;
- Interstate 76 and ramps;
- Interstate 676 (Vine Street Expressway);
- U.S. 1 (Roosevelt Expressway) and ramps;
- U.S. 1 (Roosevelt Boulevard);
- U.S. 1 (City Avenue);
- U.S. 30 (Lancaster Avenue);
- Route 63 (Woodhaven Road) ramps;
- Route 73 (Cottman Avenue);
- Route 291 (Bartram Avenue);
- Aramingo Avenue;
- 38th Street
- Rhawn Street;
- Castor Avenue;
- Adams Avenue;
- Germantown Avenue;
- Washington Lane;
- Frankford Avenue;
- Girard Avenue;
- Hunting Park Avenue;
- Rising Sun Avenue;
- Chew Avenue; and
- Wissahickon Avenue.
Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.