Closures are set in both directions in Limerick and Lower Pottsgrove Townships for pavement repair.
A vehicle fire closed down a ramp on I-76 westbound near Exit 329 in King of Prussia Friday morning.
“This new law makes significant changes to increasing many of our residents’ independence, ultimately enhancing their quality of life.”
A man died in the Dec. 28 vehicle crash that shut down U.S. 202, as police reported the death of a passenger riding 'outside' a truck.
Alternating left and right lane closures are planned on westbound U.S. 422 between the U.S. 202 and Oaks interchanges Monday night.
The area between Dekalb Pike and City Avenue interchanges will close periodically Monday through Thursday for tree trimming operations.
All lanes are closed on I-76 westbound through Tredyffrin Twp. because of an accident at mile marker 320.4 this afternoon.
The Pennsylvania State Police are reminding drivers about the importance of safe driving and consistent seat belt use this holiday season.
Funds will improve the Harrisburg Line between Paoli and Overbrook.
A U.S. Rep.'s bill wants Amtrak's Keystone East Line turned over to the state, including the high-traffic, award-winning Paoli Station.
The bridge on Howellville Road that goes over a railroad in Tredyffrin Twp. is being replaced, and work will continue through next May.
Water main replacement in Tredyffrin and East Whiteland townships will detour travelers for the rest of August.
On Lancaster Avenue through East Whiteland Twp. lanes will be restricted between Planebrook Road and Coffman Street.
PECO will be doing utility construction this week along a portion of Leopard Road in Tredyffrin this week, forcing a lane to close.
PennDOT said paving work will affect traffic on a portion of Lancaster Avenue in Tredyffrin and Easttown townships next week.
PECO will be doing utility and pole work along Howelville Road in Tredyffrin Township for about three weeks.
Sugartown Road in Tredyffrin will have lane restrictions due to a project to resurface numerous highways in the region.
Valley Road will have lane restrictions daily through Saturday for milling work, according to PennDOT.
Aqua Pennsylvania will be replacing water mains along Swedesford Road in Tredyffrin and East Whiteland townships through early August.
PennDOT said Aqua Pennsylvania will be installing utilities along a portion of Lancaster Avenue in Tredyffrin for two days next week.
According to PennDOT, Valley Road will have lane restrictions Monday through Wednesday next week.
Lane restrictions will be in place between Whitehorse and Yellow Springs roads on Valley Road for two days this week.
A portion of Sugartown Road will have lane restrictions Monday, May 18 through Friday, May 22 due to resurfacing work, PennDOT said.
PECO will close a lane on Lancaster Avenue for four days next week as its crews work on utility construction.
Rehabilitation work on the bridge over Norfolk Southern Railroad tracks is expected to be completed in fall this year.
PECO is planning a lane closure on eastbound Lancaster Avenue/U.S. Route 30 in Easttown Township next week.
To report a downed tree or debris in the roadway, call the township at 610-408-3620.
During the work, Paoli Pike will be closed and drivers will be detoured at Cedar Hollow Road and directed to use Lancaster Avenue.
PECO and other utility providers will relocate utility poles and lines throughout April and May.
PennDOT said PECO work will force Lancaster Avenue lanes in both directions this week and next.
Work set to begin Monday and last all week in Tredyffrin Township has been postponed until further notice, according to PennDOT.
Tredyffrin Township said crews will be doing road repairs on a portion of the road Thursday and Friday, forcing lane restrictions.
PECO will be doing utility work from March 16 through March 20 on a portion of Darby Paoli Road in Easttown, PennDOT said.
PECO work will force a single lane closure on Lancaster Avenue next week during the daytime in both Tredyffrin and Easttown township.
PennDOT said it will start work to rehabilitate the bridge carrying Bear Hill Road/Route 252 over Norfolk Southern Railroad next week.
Tredyffrin Township said the contractor plans to work 24 hours a day until the work is completed.
Tree trimming work will force a right turning lane on Lancaster Avenue in Tredyffrin Township to close for the day Saturday, PennDOT said.
Crews will be trimming trees and relocating utility poles on Howelville Road starting next week, with work lasting up to eight weeks.
Crews will be doing sanitary sewer work for about two weeks on North Valley Road starting Monday.
PECO will be installing utility equipment on Lancaster Avenue in Easttown Township next week.