Politics & Government

RIDOT Lists Traffic, Construction Schedule

The state Department of Transportation posts its weekly list of projects and traffic pattern changes scheduled through Friday, March 18.

Interstate 95:

Pawtucket: There will be varying lane closures on I-95 NB and SB at the Pawtucket River Bridge next week for construction. Work will take place on Sunday and
Monday from 8 p.m. to 6 a.m.

Pawtucket: I-95 between Exits 27 (George St.) and 28 (School St.) posted for use only by vehicles of less than 18 tons. Detours required for heavier vehicles.

Find out what's happening in Johnstonfor free with the latest updates from Patch.

Warwick/West Warwick: I-95 NB & SB at Exit 8, lanes shifted to the left. Use caution entering and exiting.

R.I. Rte. 10:

Find out what's happening in Johnstonfor free with the latest updates from Patch.

Providence: Rte. 10 SB at the Union Ave. Bridge will be closed for construction on Sunday through Thursday from 10 p.m. to 6 a.m. a.m. One lane will remain
open in each direction until 1 a.m. After that, all traffic will use the Union Ave. exit and immediately return to the highway. Expect congestion; use I-95 to bypass the closure area.

RIPTA Bus # 18 offers free service during the bridge closure.

R.I. Rte. 6:

Providence/Cranston: The ramps to I-95 NB and SB from Rte. 6 EB will be closed for sign work Sunday from 10 p.m. to 6 a.m. Detour in place. In the event of inclement weather, the work will take place Monday from 10 p.m. to 6 a.m.

Rte. 6/10 Connector:

Cranston/Providence: Rte. 10 NB and SB, from Park Ave. to the I-195 interchange, varying lane closures for sign work, Sunday-Thursday from 10 p.m. to 6 a.m.

Local Roads:

Glocester: The Chestnut Hill Road Bridge is closed through late summer 2011 for rehabilitation. Follow signed detour using Rte. 44 (Putnam Pike) and Pine Orchard Rd.

Lincoln: The Wilbur Road Bridge over Route 146 is closed for rehabilitation through Summer 2011. Signed detours in place.

Bristol/Portsmouth: Rte. 114 on the Mount Hope Bridge, alternating lane closures for bridge construction, Monday-Friday from 9 a.m. to 3 p.m.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.