Politics & Government
City Of River Oaks: Road Closure November 3
Attached is the Traffic Control Plan for the second phase of Roberts Cutoff repaving from Barbara to Taylor. This road closure will take ...
November 2nd, 2021
Attached is the Traffic Control Plan for the second phase of Roberts Cutoff repaving from Barbara to Taylor. This road closure will take place tomorrow 11/03/2021. This will be completely closed all night. Emergency vehicles will have access at all times. . Shady Oaks and Club Oaks residents will have access to their homes. Their access point will be from Barbara. If there is any questions please do not hesitate to reach out to Gordon Smith at 817-626-5421 Extension 322 or Jeremy Bell at 817-626-5421 Extension 311.
Find out what's happening in Galleria-River Oaksfor free with the latest updates from Patch.
- Document (Sheet 2) Roberts Cut off Taylor (Road Closure)
- Document (Sheet 1) Roberts Cut Off Taylor (Road Closure)
This press release was produced by the City of River Oaks. The views expressed here are the author’s own.