Traffic & Transit
Suffield Canal Trail Repaving Expected In 2027
Suffield sought more funding after the state required asphalt for the 4.5-mile trail. Work is expected to start in 2027.
SUFFIELD, CT — Connecticut has committed more than $2.5 million for Suffield to repave the Windsor Locks Canal Trail after a design change sent the town looking for more funding, state Rep. Tami Zawistowski said Thursday. Construction is expected to begin in 2027.
Zawistowski said the Connecticut Department of Transportation accepted Suffield’s application for funding through the state’s Local Transportation Capital Improvement Program. Suffield is leading the project, which she said will cover the entire 4.5-mile state park trail into Windsor Locks.
The project will replace deteriorating pavement with asphalt. Suffield’s earlier project summary called for a stone-dust surface, which would let more water soak through. Suffield First Selectman Colin Moll wrote in a September update published by The Suffield Observer that the town initially accepted the state Department of Energy and Environmental Protection’s stone-dust plan. The transportation department required asphalt, and the town asked the Capitol Region Council of Governments for additional funding to cover the change, Moll wrote.
Find out what's happening in Suffieldfor free with the latest updates from Patch.
READ MORE:
- How Suffield Police Helped A Boy Facing Cancer
- Suffield Looks For Savings In Middle School Plan
- Report Details Medical Emergency Before Suffield Head’s Resignation
“The new pavement will also be safer for all, including families, seniors and those with mobility challenges,” Zawistowski wrote on Facebook. She said limited access for construction equipment, design changes and questions over which town had jurisdiction had slowed the project. Her announcement gave no specific start date or closure schedule.
Find out what's happening in Suffieldfor free with the latest updates from Patch.
The trail follows the historic towpath between the canal and the Connecticut River. At the Windsor Locks end, a path connects the trail to the new train station via Bridge Street.
Zawistowski also thanked the Friends of the Windsor Locks Canal State Park, whose volunteers have cleared brush, removed invasive plants and helped maintain the trail.
For more Northern Connecticut news, follow Patch editor Jay Kenney.