Politics & Government

Town Plans Virtual Meeting On Arrowhead Road Bridge Replacement

The public information meeting will take place Nov. 12 via YouTube.

Press release from the Wilton Department of Public Works:

Nov. 4, 2020

The Town of Wilton is currently reviewing the preliminary design for the replacement of the
Arrowhead Road bridge over Norwalk River as prepared by the Connecticut Department of
Transportation. Proposed work will include the removal of the existing bridge, the construction
of a replacement bridge, and roadway improvements.

Find out what's happening in Wiltonfor free with the latest updates from Patch.

A virtual informational meeting on the project will be held on Thursday, November 12, 2020 at
7:00 pm via Microsoft Teams Live Event and YouTube Live. Instructions on how to access the
meeting and other details can be found on the project webpage at
https://portal.ct.gov/DOTWilton161-143.

The Public Meeting Notice, available on the Town of Wilton website, provides additional details on how to access the event for participants with limited internet access, hearing and speech disabilities, and translation needs.

Find out what's happening in Wiltonfor free with the latest updates from Patch.

For more information, please contact Frank Smeriglio, Town Engineer and Assistant Director of
Public Works at (203) 563-0152.


This press release was produced by the Wilton Department of Public Works. The views expressed here are the author's own.