Crime & Safety

Overnight Work on Canton Road Ramps Onto I-75

Weather permitting, the DOT will be working in the area Wednesday night and into Thursday morning.

The Georgia DOT says that, weather permitting, a night time detour will reroute Canton Road traffic accessing the entrance ramps to I-75 Southbound in order to set bridge beams.

WHEN: Beginning Thursday, April 14th during the off-peak hours of 9:00 p.m. to 5:00 a.m.

WHERE: I-75 Southbound Entrance Ramp at Canton Road Connector —
Canton Road Connector traffic traveling I-75 Southbound will be directed to take the I-75 Northbound ramp to travel northbound to Barrett Parkway (Exit 269). Traffic will then be directed to turn left on Barrett Parkway followed by another left to then enter I-75 Southbound via the ramp from Barrett Parkway.

Find out what's happening in Kennesawfor free with the latest updates from Patch.

ADVISORY: Detours are likely to result in delays. Motorists are advised to exercise caution while driving in these areas. On-site message boards indicating dates, times and detour routes will be present in advance of these closures.

Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.